Hi. I’d like to share one of my layouts. This is fully automated. Trains are fed into the layout to the up and down lines from a rear fiddle yard. About the fifth train in each direction will stop in the station. Meanwhile at the back of the station there is a fully automated shunting operation continuously running. I set the shunting at a slow speed to look realistic. If you watch the whole sequence from delivery of wagons to their being ready for collection – this takes patience – it takes a while 😆
Anyway, it is quite watchable. It can be downloaded from here
Thanks for sharing your latest layout with us. A nice one. It reminds me to what I still have to do: track covers for crossings and double crossings (the covers for the turnouts will come with the next extension pack.
And many thanks for including a picture for Layout Viewer. Now a short description, like you have given here, for Layout viewer would be great. 😉